Shenzhen Esun Industrial Co., Ltd.
Leave Your Message
banner

Diverting Agent for Fracturing Operations

Diverting Agent for Fracturing Operations

  • Schematic diagram of diversion plugging for fracturing

    Product Introduction

    • Fully degraded without residue within a certain period under formation temperature.

      With viscosity close to water and little damage to the reservoir. With a matched combination of different types and particle sizes, the agent is pumped into the formation and preferentially enters fractured, high-permeability fractures and pore channels to form temporary plugging. Fracture new fractures and unstimulated zones, it achieves uniform reservoir stimulation, improves fracture complexity, and enhances reservoir producing degree and single-well productivity.

    Usage method

      The dosage is adjusted based on process design and field conditions, with approximately 100-500 kg of diverting agent added per section and 5-50 temporary plugging balls introduced per section.

    01
  • Different types of pressure steering temporary plugs

    Specification

    Specification
    Model 86PA 86PB 86PC
    Surface Knot, with well-dispersed tailwings, no agglomeration, and no impurities.
    Size Customizable (10-30mm)
    Pressure Resistance ≥20MPa
    Operating temperature 90-180℃ 20-90℃ 60-120℃
    Degradation time Customizable
    02